DESCRIPCIÓN: Emergency generation plan to power the airport in case of grid failure. Designed to ensure the continuous suppy of electricity to the new Airport Terminal.
ELECTRICITY PRODUCTION
- 7 x 3,250 kWe MTU diesel engine-generators on standby: 22.750kWe.
BACKUP GENERATION PLANT
- 5 new generator sets of 15 MVA total.
RUNWAY “H” AND 03L RECONSTRUCTION
- Design, pavement reconstruction, drainage and visual aids.
TERMINAL 2 LIGHTNING ROD SYSTEM
- 622 lightning rod points.
OTHER PROJECTS
- Adecuacy of space in Control Analysis Room.
- Platform lighting.
- Replacement of taxiway edge beacons