CONSTRUCTION AND COMMISSIONING OF POWER PLANT, RINGS AND BEACONING.
- Supply and installation of the visual aids system for the new runway.
- Construction and equipping of the Power Plant and the distribution in rings.
CONSTRUCTION OF THE CONTROL TOWER AND FIRE DEPARTMENT BUILDING