OPS – TRANSVERSAL DE COSTA PIER – SPAIN

2026
Muelle transversal de costa

Installation of electrical connection to vessels and maintenance of the installation at the pier.

DESCRIPTION: 20 kV service connection from the public grid (including Delivery
Center).

OPS Substation:

  • Capacity for 2 vessels of 5 MW (supply 6.6 kV – 60 Hz).
  • Capacity for 1 vessel of 7.5 MW (6.6 kV – 60 Hz supply).

 

Connections to vessels:

  • 2 mobile connection systems with 100 m of travel along the seawall.
Transversal de Costa Pier, Valencia