INTERXION
EMPANSION 960 m2 DATACENTER
- Place of execution: 3 months.
- On-site personnel: 100.
- Civil Works.
- Fire Fighting Systems.
- Safety and Security.
- Generating set: 3×1 600 KVA.
- UPS: 4x800Kva.
- Blindobarras: 100m 2.000 a.
- Power transformers: 3x 1.600 kVA.
- Okken Panel: 5,000 to 85 KA.
- Secondary frames: 15 pcs.
- Power cable: 50,000 m.
- Air conditioning: cracs 18×80 kW.