EXPANSION OF 960 m2 DATA CENTER – INTERXION

datacenter 960 interxion

INTERXION

 

EMPANSION 960 m2 DATACENTER

  • Place of execution: 3 months.
  • On-site personnel: 100.
  • Civil Works.
  • Fire Fighting Systems.
  • Safety and Security.
  • Generating set: 3×1 600 KVA.
  • UPS: 4x800Kva.
  • Blindobarras: 100m 2.000 a.
  • Power transformers: 3x 1.600 kVA.
  • Okken Panel: 5,000 to 85 KA.
  • Secondary frames: 15 pcs.
  • Power cable: 50,000 m.
  • Air conditioning: cracs 18×80 kW.
Interxion Madrid