DESCRIPTION: Off grid Power generation to feed Tortí municipality, a city located in Darien rain forest area.
The design of the plant includes a satellite LNG plant to provide natural gas to the plant and guarantee supply continuity.
ELECTRICITY PRODUCTION
- 2 x 1,475 kWe Dual Fuel CATERPILLAR gensets: 2,950 kWe
- 2 x 455 kWe Diesel CATERPILLAR gensets: 910 kWe
GENERACIÓN TOTAL ELECTRICIDAD: 3.860 kWe.
FUEL
- 2 x 130 m3 LNG tanks.
- 2 x atmospheric vaporizers
AUTONOMÍA: 4 DÍAS.