{"id":13646,"date":"2025-01-01T11:37:15","date_gmt":"2025-01-01T11:37:15","guid":{"rendered":"https:\/\/www.sampol.com\/proyectos\/uen-sonora-phase-ii-mexico\/"},"modified":"2025-04-07T08:34:44","modified_gmt":"2025-04-07T08:34:44","slug":"uen-sonora-phase-ii-mexico","status":"publish","type":"proyectos","link":"https:\/\/www.sampol.com\/en\/proyectos\/uen-sonora-phase-ii-mexico\/","title":{"rendered":"UEN SONORA PHASE II &#8211; MEXICO"},"content":{"rendered":"<p><b>DESCRIPTION: <\/b>Hi-efficiency power generation plant as second phase completing up to 30MW. Second phase combines a Hi efficiency new generation R&amp;R engine plus an ORC Turbine to reach an<b> electric<br \/>efficiency of 53.7%.<\/b> <\/p>\n<p><b>ELECTRICITY PRODUCTION<\/b><\/p>\n<ul>\n<li>1 x natural gas Rolls-Royce genset: 11,020 kWe.<\/li>\n<li>1 x ORC Turbine 1,400 kWe.<\/li>\n<\/ul>\n<pre><b>TOTAL POWER PHASE II: 12.420 <\/b><b>kWe<\/b><b>.<\/b><\/pre>\n","protected":false},"author":9,"featured_media":12237,"template":"","categoria_proyecto":[67],"class_list":["post-13646","proyectos","type-proyectos","status-publish","has-post-thumbnail","hentry","categoria_proyecto-energy"],"_links":{"self":[{"href":"https:\/\/www.sampol.com\/en\/wp-json\/wp\/v2\/proyectos\/13646","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sampol.com\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/www.sampol.com\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"author":[{"embeddable":true,"href":"https:\/\/www.sampol.com\/en\/wp-json\/wp\/v2\/users\/9"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sampol.com\/en\/wp-json\/wp\/v2\/media\/12237"}],"wp:attachment":[{"href":"https:\/\/www.sampol.com\/en\/wp-json\/wp\/v2\/media?parent=13646"}],"wp:term":[{"taxonomy":"categoria_proyecto","embeddable":true,"href":"https:\/\/www.sampol.com\/en\/wp-json\/wp\/v2\/categoria_proyecto?post=13646"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}