INTERXION
- Completion time: 4 months.
- 200 workers on site.
- Civil Works.
- Fire Fighting Systems.
- Safety and Security.
- Generating sets: 2x 1.600 kVA.
- UPS: 2x 600 kVA.
- Enclosed busbars: 200 m – 4.000 A.
- Power transformers: 3x 1.600 kVA.
- Okken switchgear: 5.000 A, 85 kA.
- Secondary switchgears: 25 ud.
- Power wires: 40.000 m.
- Climate control : CRACs 17x 110 kW.